The toll Road at Thoraipakkam toll plaza has been widened in 2020. The Nature of the works includes Retaining walls, Culverts, Additional road widening, Laying of Paver Blocks, Etc.
The widening of the Toll Road at Kovalam and thoraipakkam toll plaza has been completed in the year 2020. The Nature of work includes Retaining walls, Culverts, Additional road widening, Laying of Paver Blocks, Etc.
The toll Road at Kovalam toll plaza has been widened in the year 2020. The Nature of work includes Retaining walls, Culverts, Additional road widening, Laying of Paver Blocks, Etc.